TM 9-2350-261-34
52.
53.
Secure governor lever (1) to bracket (2) with 54.
screw (3) and new locknut (4).
55.
Install power plant wiring harness (5) on
cross-shaft bracket (6). Secure with two
Fill transmission (see your LO).
Check engine oil level (see your LO).
N O T E
screws (7), new locknuts (8) and clamps (9).
When you replace a transmission, m
sure you record the serial number on
form2408-10.
ake
DA
FOLLOW-THROUGH STEPS
1. Install power plant in carrier (see your 20).
2. Adjust engine power disconnect
(see your -20).
END OF TASK
Change 1
3-13