TM9-2350-261-34R E M O V E / I N S T A L L T R A N S M I S S I O NDESCRIPTIONThis task covers:Remove (page 34).Install (page 3-8).INITIAL SETUPToolsPersonnel Required:General Mechanics Tool Kit (Item 35, App B)Track Vehicle RepairerTorque Wrench (Item 112, App B)Helper (H)Torque Wrench (Item 117, App B)Transmission Hoisting AdapterReferences:(Item 1, App B)See your LO63H10Materials/Parts:See your -20Antiseize compound (Item 8, App C)Equipment Conditions:Container, 1 quart (1 liter)Power plant removed from carrierKey washer (5)(see your -20)Sealing compound (Item 70, App C)Power plant blocked (page 3–2)Sealing compound primer (Item 74, App C)Self-locking nut (2)Self-locking nut (8)Self-locking nutREMOVE1.NOTEIf you need to replace the engine,transmission, or transfer gearcase, drainthe oil from each BEFORE power plant isremoved from carrier.Cap or cover openings where fuel, oil, orcoolant lines or fittings have beenremoved.Remove two screws (1), locknuts (2), clamps (3), and power plant wiring harness (4) from cross–shaft bracket (5). Discard locknuts.2. Remove screw (6), locknut (7) and governorlever (8) from bracket (9). Discard locknut.3-4Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business