This task covers:
Remove (page 34).
Install (page 3-8).
INITIAL SETUP
Tools
Personnel Required:
General Mechanics Tool Kit (Item 35, App B)
Track Vehicle Repairer
Torque Wrench (Item 112, App B)
Helper (H)
Torque Wrench (Item 117, App B)
Transmission Hoisting Adapter
References:
(Item 1, App B)
See your LO
63H10
Materials/Parts:
See your -20
Antiseize compound (Item 8, App C)
Equipment Conditions:
Container, 1 quart (1 liter)
Power plant removed from carrier
Key washer (5)
(see your -20)
Sealing compound (Item 70, App C)
Power plant blocked (page 32)
Sealing compound primer (Item 74, App C)
Self-locking nut (2)
Self-locking nut (8)
Self-locking nut
REMOVE
1.
NOTE
If you need to replace the engine,
transmission, or transfer gearcase, drain
the oil from each BEFORE power plant is
removed from carrier.
Cap or cover openings where fuel, oil, or
coolant lines or fittings have been
removed.
Remove two screws (1), locknuts (2), clamps
(3), and power plant wiring harness (4) from
crossshaft bracket (5). Discard locknuts.
2. Remove screw (6), locknut (7) and governor
lever (8) from bracket (9). Discard locknut.
3-4