TM9-2350-261-34
B L O C K P O W E R P L A N T
INITIAL SETUP
Tools:
Lifting Sling (Item 84. App B)
Materials/Parts:
Personnel Required:
All blocks are made from surfaced dimensioned
Track Vehicle
lumber. Dimensions are in inches with metric
Helper (H)
equivalents.
References:
Lumber 4 x 6 x 18 (10 x 15 x 46 cm) (5)
See your 20
Lumber 4 x 6 x 10 (10 x 15 x 25 cm)
Repairer 63H10
Equipment Conditions:
Lumber 2 x 4 x 10 ( 5 x 10 x 25 cm)
Power plant removed from carrier
Lumber 1 x 4 x 10 ( 3 x 10 x 25 cm)
(see your 20)
Wiping rag (Item 86, App C)
BLOCK POWER PLANT
1.
disassembly.
W A R N I N G
You could get hurt if power
plant is not blocked to
prevent sudden movement
of
a
component.
Block
p o w e r p l a n t a s s h o wn
before you
attempt any
W A R N I N G
Hanging loads could kill or
injure you. Keep away horn
hanging loads and over-
head
equipment.
Keep
hands
out
of
engine
compartment while power
unit is being removed or installed.
Use a lifting device of at least 2,500 lb
(1, 135 kg) capacity and sling to lift power
plant. Have helper (H) assist.
2.
3.
On level ground, place two 4 x 6 x 18 inch
(10 x 15 x 46 cm) blocks (1) under front of
engine. Place blocks parallel to each other
with 6 inch side down. Blocks should be
about 18 inches (46 cm) apart from outside
edges.
Stack two 4 x 6 x 18 inch (10 x 15 x 46
cm) blocks (2) on top of each other. Place
blocks (2) on top of blocks (1) at a 90 degree
angle. Blocks will be about 10 1/2 inches (24
cm) high.
3-2
Lumber 2 x 4 x 18 ( 5 x 10 x 46 cm)