TM 9-2350-261-20-2
INSTALL
8. Install new grommet (1) in drivers floor
9.
10.
11.
plate.
Feed cable assembly (2) through mounting
hole in drivers compartment bulkhead to
power plant front access door opening.
Slide washer (3) and nut (4) on cable
assembly (2). Secure to drivers compartment
bulkhead.
Install cable assembly (2) on two weldnuts
(5). Secure with two washers (6), screws
(7), and four clamps (8).
12.
13.
14.
Install cable assembly (2) on weldnut (9).
Secure with two straps (10), screws (11),
new lockwasher (12), and one new
locknut (13).
Install pin (14) on accelerator pedal assem-
bly (15). Secure with washer (16) and new
cotter pin (17).
Install cable assembly (2) on pin (14).
Secure with collar (18) and set screw (19).
ADJUST
15. Loosen set screw (19). Push control cable
assembly (2) handle full forward.
16. Place pedal assembly (15) in full closed
throttle position (see your -10). Tighten set
screw (19) in collar (18).
FOLLOW-THROUGH STEPS
front access door
1. Start engine (see your -10). Using the pedal
3. Close power plant
(15), check that hand throttle operates
(see your -10).
properly.
4. Raise trim vane (see your 10).
2. Stop/shutdown engine (see your 10).
5. Install drivers power plant access panel
(see your -10).
END OF TASK
23-43