TM 9-2350-261-20-2
R E P L A C E T R A N S F E R G E A R C A S E O I L L E V E L D I P S T I C K , T U B E,
A N D G U I DE
INITIAL SETUP
Tools:
References:
General Mechanics Tool Kit (Item 30, App D)
see your -10
Materials/Parts:
Equipment Conditions:
Dipstick tube
Engine stopped/shutdown (see your -10)
Preformed packing
Carrier blocked (see your -10)
Power plant rear access panels removed
Personnel Required:
(page 24-27 or 24-29)
Unit Mechanic
REMOVE
1. Remove dipstick (1) from dipstick tube (2).
2. Remove dipstick tube (2) and guide (3) from
transfer gearcase (4).
3. Remove preformed packing (5) from dipstick
tube (2). Discard packing.
CLEAN, INSPECT, AND REPLACE
4.
5.
6.
Check dipstick. Replace dipstick that is bent
or worn.
Check dipstick tube. Replace tube that is
cracked or has stripped threads.
Check dipstick guide. Replace guide that is
cracked or worn.
INSTALL
7. Position new preformed packing (5)
on dipstick tube (2).
8. Install dipstick tube (2) and guide (3) in
transfer gearcase (4).
9. Install dipstick (1) in dipstick tube (2).
FOLLOW-THROUGH STEPS
1. Install power plant rear access panels
(page 24-27 or 24-29).
END OF TASK
19-3
