TM 9-2350-261-20-2 R E P L A C E T R A N S F E R G E A R C A S E L I F T I N G E Y E B O L T , C O V E R ,A N D P L U GINITIAL SETUPTools:General Mechanics Tool Kit (Item 30, App D)Materials/Parts:Preformed packingPersonnel Required:Unit MechanicReferences:See your -10See your LOREMOVE1.2.3.Remove eyebolt (1) from transfer gearcase(2).Remove two screws (3) and cover (4) fromgearcase (2).Remove plug (5) and preformed packing (6)from bottom of gearcase (2). Discard packing.INSPECT, CLEAN, AND REPLACE4. Check fittings and housing for cracks anddamage. Replace as needed.INSTALL5. Install new preformed packing (6) and plug(5) in gearcase (2).6. Install cover (4) and two screws (3) ingearcase (2).7. Install eyebolt (1) on gearcase (2).Equipment Conditions:Engine stopped/shutdown (see your -10)Ramp lowered (see your -10)Power plant rear access panels removed(page 24-27 or 24-29)Carrier blocked (see your -10)Power plant bottom access cover removed(page 24-32)Suitable container placed under hull openingto catch oilTransfer gearcase drained into container(see your LO)19-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business