TM 9-2350-261-20-256.57.58.59.60.Connect circuits 21, 22, 23, and 24 leads (1, 61.2, 3, and 4) to front main wiring harness.Connect circuits 450. 450B. and 451A leads 62.(5, 6, and 7) to bilge pump switch.Connect circuit 38 lead (8) to instrumentpanel wiring harness.Connect circuit 451B lead (9) to rear bilge63.pump on indicator light.Connect circuit 28 lead (10) to fuel gage,Support instrument panel (11) on twostruts (12).Install ground lead (13 ) and new lockwasher(14) on upper support (15). Install panel(11) with two mounts (16) on support ( 15).Secure with two screws (17) and flatwashers (18).Install panel (11) on two struts (12). Securewith two nuts (19), mounts (20 and 21),flat washers (22), and screws (23).GO TO NEXT PAGE12-113
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business