TM 9-2350-261-20-2
92.
93.
94.
95.
96.
Install rear main wiring harness (1) on
guard (2). Secure with two screws (3), nuts
(4), and clamps (5).
Install guard (2) on two weldnuts (6). Se-
cure with two screws (7) and new
Iockwashers (S).
Install wiring harness (1) on three cradles
(9). Secure with three cradle clips ( 10).
Install screw (11), nut (12), and clamp (13)
on wiring harness (1).
Install two screws (14), nuts (15), and
clamp (13) on floor transverse beam ( 16).
97.
98.
99.
100.
Install two new lockwashers (17), clamp
(18), wiring harness (19), and circuit 90
ground lead (20) on weldnut (21). Secure
with screw (22).
Connect circuits 21, 22, 23, and 24 leads
(23, 24, 25, and 26) to trailer wiring har-
ness (27).
Connect circuit 451 lead (28) to rear bilge
pump (29).
Install wiring harness (19) on two weld-
nuts (30). Secure with two screws (31),
clamps (32), and washers (33).
PAGE
GO TO NEXT
12-117