T M
82.
83.
84.
85.
86.
9-2350-261-20-2
Install clamp (1) and wiring harness (2) on
weldnut (3). Secure with screw (4).
Connect circuit 28 lead (5) to fuel quantity
sending unit (6).
Install wiring harness (2) on two cradles
(7). Secure with two cradle clips (8).
Install wiring harness (9) on guard (10). Se-
cure with three screws (11), three nuts (12),
and three clamps (13).
Install guard on three weldnuts (14). Secure
with three screws (15) and new
lockwashers (16).
87.
88.
89.
90.
91.
Install nut (17) and bushing (18) on leads
( 1 9 , 2 0 , a n d 2 2 ) .
Pull leads ( 19, 20, and 21) through connec-
tor (22). Secure with bushing (18) and
nut (17),
Install three new terminals (23), insulators
(24), and connectors (25) on three leads
(19, 20, and 21).
Connect circuits 21, 22, and 24 leads
(19, 20, and 21) to left tail light (26).
Install left tail light (26) and guard (27) on
outside rear of hull. Secure with four screws
(28) and new lockwashers (29).
12-116