8.
9.
Place adapter (1) on engine adapter, and
secure with nut.
Coat flexible drive shaft (2) with grease and
install in cable (3) (see your LO).
N O T E
Install keyed end of drive shaft (2) in
tachometer end of cable (3).
If cable (3) is being replaced, remove all
clamps and install them on new cable.
10. Pull drive shaft (2) part way out of adapter
end of cable (3), install slotted washer (4)
and flat washer (5), on shaft.
11. Install new grommet (6) on cable (3). Route
cable through power plant and drivers
compartment.
12. Install new gasket (7)
on tachometer (8) and
adapter ( 1).
TM 9-2350-261-20-2
in cable. Install cable
right angle drive
N O T E
Place cable at tachometer connection as
close to carrier wall as possible to
minimize bend. All other cables and leads
should be in front of the tachometer
cable.
13.
14,
Align clamp (9) with clamp (10), and secure
with screw (11) and new locknut (12).
Align seven cable clamps (13) with power
plant and drivers compartment bulkhead
weldnuts. Secure with seven new
lockwashers (14) and screws (15).
FOLLOW-THROUGH STEPS
1. Install power plant rear access panel
4.
(page 24-27 or 24-29).
2. Install drivers power plant access panel
(page 24-25).
5.
3. Close power plant front access door and raise
trim vane (see your -10).
Start engine to check for proper installation
of tachometer cable and adapter
(see your -10).
Stop/shutdown engine (see your -10).
END OF TASK
11-15
I N S T A L L