8.9.Place adapter (1) on engine adapter, andsecure with nut.Coat flexible drive shaft (2) with grease andinstall in cable (3) (see your –LO).N O T EInstall keyed end of drive shaft (2) intachometer end of cable (3).If cable (3) is being replaced, remove allclamps and install them on new cable.10. Pull drive shaft (2) part way out of adapterend of cable (3), install slotted washer (4)and flat washer (5), on shaft.11. Install new grommet (6) on cable (3). Routecable through power plant and driver’scompartment.12. Install new gasket (7)on tachometer (8) andadapter ( 1).TM 9-2350-261-20-2in cable. Install cableright angle driveN O T EPlace cable at tachometer connection asclose to carrier wall as possible tominimize bend. All other cables and leadsshould be in front of the tachometercable.13.14,Align clamp (9) with clamp (10), and securewith screw (11) and new locknut (12).Align seven cable clamps (13) with powerplant and driver’s compartment bulkheadweldnuts. Secure with seven newlockwashers (14) and screws (15).FOLLOW-THROUGH STEPS1. Install power plant rear access panel4.(page 24-27 or 24-29).2. Install driver’s power plant access panel(page 24-25).5.3. Close power plant front access door and raisetrim vane (see your -10).Start engine to check for proper installationof tachometer cable and adapter(see your -10).Stop/shutdown engine (see your -10).END OF TASK11-15I N S T A L L
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business