TM 9-2350-261-20-2INSTALL4. Install gage (1) in front of instrument panel.NOTECheck front of instrument panel to makesure gage is aligned correctly beforetightening nuts.5. Install bracket (2) on rear of gage, and se-cure with two new lockwashers (3) andnuts (4).CAUTIONMake sure circuit leads are connected tocorrect gages. See wiring diagram (FO-2).6. Connect circuit leads (5) to rear of gage (1).FOLLOW-THROUGH STEPS1. Install instrument panel (page 11-2).4. Check fuel gage and battery generator gagefor operation (see your -10).2. Connect battery ground lead (page 13-2).5. Start engine to check operation of coolant3. Turn MASTER SWITCH ON (see your -10).temperature gage (see your –10).6. Stop/shutdown engine (see your -10),END OF TASK11-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business