TM 9-2350-261-20-18. Remove locknut (1),three cables (4) andhousing (6). DiscardI N S T A L L9.10.11.12.13.14.15.16.screw (2), clampbracket (5) fromlocknut.Install bracket (5) and three cables (4) on(3),housing (6). Secure with clamp (3), screw(2), and new locknut (1).Secure pin (7) to baffle (8) with new cotterpin (9) and washer (10).Secure hinge (11) to baffle (8) with twoscrews (12), washers (13), and newlocknuts (14) .Install baffle (8) and hinge (11) in housing(6). Secure with two screws (15), washers(16), and nuts (17).With cable in full forward position and bafflein down position, support housing (6) andsecure cable (18) to pin (7) with two collars(19) and setscrews (20).Secure cable (18) and two clamps (21) toweldnut (22) with washer (23), screw (25),and new locknut (24).Secure housing (6), new gasket (26), andscreen (27) to driver’s compartment bulkheadwith three screws (28) and washers (29).Secure plate (30), housing (6), and newgasket (26) to driver’s compartmentbulkhead with five screws (31), washers(32), and two spacers (33).FOLLOW-THROUGH STEPS1.2.3.Install air cleanerInstall air cleaner(page 7-7).hose (page 7-3).4.element and housing5.Install driver’s power plant access panel6.(page 24-25).7.Close power plant from access panel door(see your -10).Raise trim vane (see your -10).Start engine (see your -10). Check air controlvalve for proper operation.Engine stopped/shutdown (see your -10).END OF TASK7-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business