TM 9-2350-261-20-1
8. Remove locknut (1),
three cables (4) and
housing (6). Discard
I N S T A L L
9.
10.
11.
12.
13.
14.
15.
16.
screw (2), clamp
bracket (5) from
locknut.
Install bracket (5) and three cables (4) on
(3),
housing (6). Secure with clamp (3), screw
(2), and new locknut (1).
Secure pin (7) to baffle (8) with new cotter
pin (9) and washer (10).
Secure hinge (11) to baffle (8) with two
screws (12), washers (13), and new
locknuts (14) .
Install baffle (8) and hinge (11) in housing
(6). Secure with two screws (15), washers
(16), and nuts (17).
With cable in full forward position and baffle
in down position, support housing (6) and
secure cable (18) to pin (7) with two collars
(19) and setscrews (20).
Secure cable (18) and two clamps (21) to
weldnut (22) with washer (23), screw (25),
and new locknut (24).
Secure housing (6), new gasket (26), and
screen (27) to drivers compartment bulkhead
with three screws (28) and washers (29).
Secure plate (30), housing (6), and new
gasket (26) to drivers compartment
bulkhead with five screws (31), washers
(32), and two spacers (33).
FOLLOW-THROUGH STEPS
1.
2.
3.
Install air cleaner
Install air cleaner
(page 7-7).
hose (page 7-3).
4.
element and housing
5.
Install drivers power plant access panel
6.
(page 24-25).
7.
Close power plant from access panel door
(see your -10).
Raise trim vane (see your -10).
Start engine (see your -10). Check air control
valve for proper operation.
Engine stopped/shutdown (see your -10).
END OF TASK
7-12