TM 9-2350-261-20-1INSTALL3. Install air cleaner element (1) in housing (2)and turn element until slot on bottom isbetween stops in housing.NOTEDrain hole in housing (2) must be posi-tioned as shown to align latches.4. Secure housing (2) to cover (3) with fourlatches (4).FOLLOW-THROUGH STEPS1. Install driver’s power plant access panel(page 24-25).WARNINGLoose clothing is dangerousaround moving belts andpulleys. You could get bad-ly hurt if your clothes getcaught in moving parts.2.3.4.5.Start engine (see your -10). Check air cleanerfor proper operation.Stop/shutdown engine (see your -10).Close power plant front access door(see your -10).Raise trim vane (see your -10).END OF TASK7-8Change 4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business