INSTALL5.7.Install exhaust pipe (1) in exhaust pipe (2).N O T EStep 6 is for the early system. Step 7 is forthe current system.Install and secure exhaust pipes (1 and 2) onengine exhaust manifolds (3 and 4) andmuffler joint (5) with two muffler jointclamps (6).Install exhaust pipe (1) on muffler joint (5).Install and secure exhaust pipes (1 and 2) onengine exhaust manifolds (3 and 4) with twoclamps (7) .8.9.TM 9-2350-261-20-1 Tighten two clamps (7) to 204-216 lb-in(23-25 N•m) torque. Use torque wrench(Item 95) and socket wrench set (Item 89).N O T EStep 9 is for early system only.Tighten two muffler clamps (6) to36-60 lb-in (4-7 N•m) torque. Use torquewrench (Item 99) and socket wrench set(Item 88).FOLLOW-THROUGH STEPS 1. Install air cleaner housing and element(page 7-7).W A R N I N GLoose clothing is dangerousaround moving belts andpulleys. You could get bad-ly hurt if your clothes getcaught in moving parts.2.3.4.5.Start engine (see your -10). Check for leaks.Engine stopped/shutdown (see you -10).Close power plant front access doorsee your -10.Raise trim vane (see your -10).END OF TASK7-176.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business