TM 9-2350-261-20-1
INSTALL
15.
16.
17.
18.
19.
20.
21.
Apply a thin even coat of sealing compound
(Item 52) to gasket mounting surface on
bladder compartment.
Allow sealing compound to become tacky and
install new gasket (1) on bladder (2).
Apply a thin even coat of sealing compound
(Item 46) to cleaned external threads of fit.
tings before installation.
Install elbow (3) and adapter (4) on supply
tube (5).
Install hose assembly (6) in
reinforcement (7).
Install grommet (8) on hose assembly (6).
Connect hose assembly (6) to adapter (4).
22.
23.
24.
25.
26.
27.
Install seven eyebolts (9) inside compart-
ment (10). Align to accept hanger rods (11)
when bladder (2) is installed.
Fold and compress bladder (2). Install in
compartment (10) through top opening with
bladder openings aligned with compartment
openings.
Align ferrules on top of bladder (2) with eye-
bolts (9) and brackets (12). Start two
hanger rods (11) through ferrules, eyebolts
(9), and brackets (12).
Alternate from side to side until hanger rods
(11) are through all bladder ferrules,
eyebolts (9), and brackets (12).
Secure two hanger rods (11) to two brackets
(13) with two new cotter pins (14).
Push bladder (2) into compartment (10) so
it unfolds.
I
6-96