TM 9-2350-261-20-1R E P L A C E C O M P A R T M E N T T O B U L K H E A D F U E L H O S E S , T U B E S ,A N D F I T T I N G S ( M 7 4 1 A 1 O N L Y )DESCRIPTIONThis task covers:Remove (page 6-98).Install (page 6-99).INITIAL SETUPTools:General Mechanics Tool Kit (Item 30, App D)Materials/Parts:Sealing compound (Item 46, App C)Wiping rag (Item 61, App C)Personnel Required:Unit MechanicReferences:See your -10Equipment Conditions:Ramp lowered (see your -10)Engine stopped/shutdown (see your -10)Battery ground lead disconnected (page 13-2)Power plant rear access panel removed(page (24-27)Floor plates removed (page 24-40)Ammunition stowage containers removed(page 24-199)Fuel bladder drained (page 6-88)1.2.3.4.5.6. Remove two jamnuts and nipples (5) fromtransverse beam.WARNINGFuel flowing over a metal7. Remove 8 screws (8), 16 clamps (9), and fuelsurfacecausesstatichoses (3 and 4) from 8 weldnuts (10).electricity. This will cause aspark unless the surface isgrounded.NOTEUse wiping rag to wipe up any spilled fuel.Tag hoses before removing.Disconnect two quick disconnect couplinghalves (1) from two quick disconnect couplinghalves (2) inside power plant rear bulkhead.Disconnect fuel supply hose (3) and fuel re-turn hose (4) from two nipples (5) intransverse beam.Remove two quick disconnect coupling halves (2) from two elbows (6).Remove two elbows (6) from two tubeassemblies (7).Remove two tube assemblies (7) from twonipples (5).6-98R E M O V E
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business