TM 9-2350-261-20-122.23.24.25.26.27.28.Install two nipples (1) in transverse beamand secure with two jamnuts.Connect fuel supply hose (2) and fuel returnhose (3) on two nipples (1).Install two tube assemblies (4) to twonipples (1).Install two elbows (5) to two tubeassemblies (4).Connect two quick disconnect coupling halves(6) to two elbows (5).Connect two quick disconnect coupling halves(7) to two quick disconnect coupling halves(6) inside power plant bulkhead.Connect fuel supply hose (2) and fuel returnhose (3) to 8 weldnuts (8) with 16 clamps(9) and 8 screws (10).FOLLOW-THROUGH STEPS1. Connect battery ground lead (page 13–2).5. Install floor plates (page 2440).2. Fill fuel bladder (see your -10).6. Install ammunition containers (page 24-199).3. Start engine (see your –10). Check for leaks.7. Raise and lock ramp (see your -10).4. Install power plant rear access panel(page 24-27).8. Stop/shutdown engine (see your -10).END OF TASK6-100
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business