40.
41.
42.
43.
44.
Install three adapters (1) in check valve (2).
Connect tube assembly (3) and two supply
hoses (4 and 5) to three adapters (1).
Connect elbow (6) (or tee (7) if personnel
heater is installed) to tube (3).
Secure tube (3) to weldnut (8) with clamp
(9), new lockwasher (10), and screw (11).
Install supply hose (5) and Six clamps (12)
on three weldnuts (13). Secure with three
screws (14) and new lockwashers (15).
45.
46.
47.
48.
49.
Install heater tube (if personnel heater is
installed) (page 29-26).
Secure guard (16) to hull
(17) and washer (18).
Secure supply hose (5) to
(19) with new strap (20)
er is installed).
Connect supply hose (21)
with two screws
heater fuel hose
(if personnel heat-
to elbow (6) (or
tee (7) if personnel heater is installed).
Secure supply hoses (21 and 4) and return
hose (22) together with three new
straps (23).
6-42
TM 9-2350-261-20-1