Install two guards (1) on hull. Secure with
54.
five screws (2) and new lockwashers (3).
Secure bulkhead elbow (4) to power plant
55.
rear bulkhead with nut (5).
Connect tube assembly (6) to bulkhead
56.
elbow (4).
Connect elbow (7) to tube assembly (6).
Connect quick disconnect half (8) to
elbow (7).
Connect supply hose (9) to bulkhead
elbow (4).
Connect quick disconnect half (10) to quick
disconnect half (8) at power plant rear
bulkhead.
FOLLOW-THROUGH STEPS
1. Fill fuel tanks (see your -10).
5. Install power plant rear access panel
(page 24-27).
2. Connect battery ground leads (page 13-2).
6. Raise and lock ramp (see your -10).
3. Start engine (see your -10). Check for leaks.
7. Stop/shutdown engine (see your -10).
4. Install cargo area floor plates
(see TM 9-2350-266-20).
END OF TASK