Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-34_675
DISASSEMBLY - TM-9-2350-277-34_678
TM-9-2350-277-34 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
574
575
576
577
578
579
580
581
582
583
584
TM 9-2350-277-34
REPAIR
EXTERNAL COMMUNICATION
BOX A11 (M1068A3 ONLY)
0100 00
THIS WORK PACKAGE COVERS:
Disassembly (page 0100 00-1).
Assembly (page 0100 00-5).
INITIAL SETUP:
Maintenance
Level
Direct Support
Tools and Special Tools
Electronic Equipment Tool Kit TK-105/G
(WP 0120 00, Item 61)
Materials/Parts
Locknut (8)
Locknut (8)
Locknut (4)
Locknut (2)
Lockwasher (22)
P
ersonnel
Required
Radio Repairer 29E10
References
See your -20
E
quipment
Condition
External communication
box removed (see your -20)
DISASSEMBLY
1.
Remove four screws (13), locknuts (14), and two latches (15) from communication box (2). Discard locknuts.
0100 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business