TM 9-2350-277-20-6REPLACE POWER ENTRY BOX ASSEMBLY A4 (M1068A3 ONLY) — Continued 0832 00INSTALLATION1. If gasket (1) was removed in Step 5, cement new gasket on rear of power entry box (2).2. Insert cables W13 (3), W14 (4), and ground lead (5) into power distribution box (6). Feed leads through rear ofbulkhead. Have helper assist.3. Install power entry box (2) on external rear bulkhead. Secure with three washers (7) and screws (8).4. Install two cable W13 leads (3) on terminal 1 of terminal block (9). Secure with lockwasher (10) and screw (11).5. Install two cable W14 leads (4) on terminal 2 of terminal block (9). Secure with lockwasher (10) and screw (11).6. Install ground cable lead (5) on terminal 3 of terminal block (9). Secure with lockwasher (10) and screw (11).7. Install lid (12) on power distribution box (6). Secure with 12 new lockwashers (13) and screws (14).FOLLOW-THROUGH STEPS1. Connect battery ground lead (WP 0338 00).END OF TASK0832 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business