Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-5_345
REPAIR PERSONNEL HEATER ASSEMBLY - TM-9-2350-277-20-5_347
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
271
272
273
274
275
276
277
278
279
280
281
TM 9-2350-277-20-5
REPLACE PERSONNEL HEATER ASSEMBLY (M1064A3 ONLY) — Continued
0704 00
FOLLOW-THROUGH STEPS
1.
Connect
fuel hose
to heater (WP 0688 00).
2.
Install heater hose on duct (WP 0706 00).
3.
Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00).
4.
Start heater (see your -10). Check heater for proper operation. Turn heater off.
END OF TASK
0704 00-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business