TM 9-2350-277-20-5REPLACE PERSONNEL HEATER DUCT AND HOSES — Continued 0706 00INSTALLATION1. Align duct (5), three insulator washers (9), and shield (8) with holes in carrier floor. Secure with three washers (7) andscrews (6).2. Install nipple (3) in duct (5) and nipple (3) in duct (4). Secure with latch on each nipple.3. Install two clamps (1) on hose (2). Secure hose in two nipples (3) with clamps.FOLLOW-THROUGH STEPS1. Start engine (see your -10).2. Raise and lock ramp (see your -10).3. Stop engine (see your -10).END OF TASK0706 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business