TM 9-2350-277-20-5
REPLACE PERSONNEL HEATER ASSEMBLY (ALL EXCEPT M1064A3) — Continued
0703 00
10. Install ground strap (12) on heater (9). Secure with two new
lockwashers
(13) and screw (14).
11. Tighten clamp (15) on heater
exhaust pipe
(16).
12. Tighten clamp (17) on heater intake pipe (18).
13. Connect heater wiring harness (19) to heater (9).
FOLLOW-THROUGH STEPS
1.
Install heater hose on plenum (WP 0706 00).
2.
Install power plant rear access panel (see your -10).
3.
Connect battery ground strap (WP 0337 00),(WP 0338 00), or (WP 0339 00).
4.
Start heater (see your -10). Check heater for proper operation. Turn heater off.
5.
Secure spall liners (M113A3 only) (see your -10).
END OF TASK
0703 00-8