TM 9-2350-277-20-5REPLACE BULKHEAD CONNECTION TO PERSONNEL HEATER TUBE (M577A3 ANDM1068A3 ONLY) — Continued0687 00FOLLOW-THROUGH STEPS1. Open heater fuel shutoff valve (see your -10).2. Connect battery ground lead (WP 0338 00).3. Bleed fuel line (WP 0679 00).4. Start heater (see your -10). Check all fittings for leaks. Turn heater off.5. Install power plant rear access panel (WP 0439 00).6. Install right front floor plate (WP 0539 00) or (WP 0544 00).7. Install heater duct (WP 0706 00).8. Start engine (see your -10).9. Raise and lock ramp (see your -10).10. Stop engine (see your -10).END OF TASK0687 00-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business