Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-5_257
INSTALLATION - TM-9-2350-277-20-5_260
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
192
193
194
195
196
197
198
199
200
201
202
TM 9-2350-277-20-5
REPLACE PERSONNEL HEATER FUEL TUBE (ALL EXCEPT M1064A3)
0686 00
THIS WORK PACKAGE COVERS:
Removal (page 0686 00-1).
Installation (page 0686 00-2).
INITIAL SETUP:
Maintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Lockwasher
P
ersonnel
Required
Unit Mechanic
R
eferences
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Main fuel tank shutoff valves closed (see your -10)
Power plant rear access panels removed (WP 0439 00)
REMOVAL
1.
Remove screw (1) and lockwasher (2) from clamp (3). Discard lockwasher.
2.
Disconnect heater fuel tube (4) from fuel filter inlet hose elbow (5).
3.
Remove nut (6) from nipple (7). Remove tube from carrier.
0686 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business