TM 9-2350-277-20-5
REPLACE BULKHEAD CONNECTION TO PERSONNEL HEATER TUBE
(M577A3 AND M1068A3 ONLY)
0687 00
THIS WORK PACKAGE COVERS:
Removal (page 0687 00-1).
Installation (page 0687 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 56)
Wiping rag (WP 0928 00, Item 65)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery ground lead disconnected (WP 0338 00)
Heater duct removed (WP 0706 00)
Right front floor plate removed (WP 0539 00) or
(WP 0544 00)
Power plant rear access panel removed (WP 0439 00)
Heater fuel shutoff valve closed (see your -10)
REMOVAL
WARNING
Fuel can catch fire and burn you. Do not smoke. Wipe up spilled fuel.
1.
Remove fuel hose (1) from nipple (2).
0687 00-1