Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-5_168
REMOVAL-cont. - TM-9-2350-277-20-5_170
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
115
116
117
118
119
120
121
122
123
124
125
TM 9-2350-277-20-5
REPLACE RAMP CYLINDER BREATHER HOSE (ALL EXCEPT M1064A3)
0666 00
THIS WORK PACKAGE COVERS:
Removal (page 0666 00-1).
Installation (page 0666 00-3).
INITIAL SETUP:
M
aintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 56)
Locknut
Lockwasher (3)
P
ersonnel
Required
Unit Mechanic
R
eferences
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Rear floor plate removed (WP 0539 00)
REMOVAL
1.
Remove three screws (1),
lockwashers
(2), and clamps (3) from hull and bulkhead weldnuts. Discard lockwashers.
2.
Remove screw (4), washer (5), locknut (6), and two clamps (7)(8) from bilge pump pipe (9) and breather hose (10).
Discard locknut.
0666 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business