Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-4_68
INSTALLATION - TM-9-2350-277-20-4_70
TM-9-2350-277-20-4 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
26
27
28
29
30
31
32
33
34
35
36
TM 9-2350-277-20-4
REPLACE DRIVE SPROCKET AND CARRIER ASSEMBLY
0420 00
THIS WORK PACKAGE COVERS:
Removal (page 0420 00-1).
Installation (page 0420 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Socket Wrench Set (WP 0926 00, Item 73)
Torque
Wrench (WP 0926 00, Item 86)
M
aterials/Parts
Self-locking screws (10)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Carrier on level surface
Engine stopped (see your -10)
Carrier blocked (see your -10)
Track shroud and covers removed (WP 0438 00)
Track disconnected (see your -10)
REMOVAL
1.
Remove track from drive sprockets (1).
2.
Remove 10 self-locking screws (2), 2 drive sprockets (1), and carrier assembly (3) from final drive (4). Discard
self-locking screws.
0420 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business