TM 9-2350-277-20-4REPLACE TORSION BAR ANCHOR 0414 00THIS WORK PACKAGE COVERS:Removal (page 0414 00-1).Installation (page 0414 00-3).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Socket Wrench Set (Required for M1064A3 5th anchoronly) (WP 0926 00, Item 73)Torque Wrench (Required for M1064A3 5th anchoronly) (WP 0926 00, Item 86)Materials/PartsCotter pin (2)Preformed packing (Required for 3rd, 4th, & 5th anchorsonly)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionCarrier on level surfaceEngine stopped (see your -10)Carrier blocked (see your -10)Track shroud and covers removed (WP 0438 00)Road wheel removed (WP 0426 00)Torsion bar removed (WP 0413 00)Power plant removed (Required for 2nd right anchoronly) (WP 0156 00)REMOVALNOTEThe 5th anchor on the M1064A3 carrier is secured with screws instead of pins because it islocated under the welded floor plates next to the mortar turntable.NOTEOn all carriers, preformed packings are located behind the 3rd, 4th, and 5th anchors only.0414 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business