TM 9-2350-277-20-4REPLACE RIGHT SIDE SPALL LINERS (M113A3 ONLY) 0504 00THIS WORK PACKAGE COVERS:Removal (page 0504 00-1).Installation (page 0504 00-4).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Torque Wrench (WP 0926 00, Item 85)Personnel RequiredUnit MechanicHelper (H)ReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Ramp lowered (see your -10)Quick release pins and plates removed (WP 0506 00)REMOVAL1. Position four shields (1) to rear of carrier.2. Remove 12 screws (2) and washers (3) from upper front track (4). Remove track from hull.NOTEIf upper front track needs to be replaced, do Step 3.3. Loosen screw (5), and slide stop assembly (6) off end of upper front track (4).4. Remove five screws (7) and washers (8) from lower front track (9) and support (10).0504 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business