C Perform complete annual service.
CHECKING UNPACKED EQUIPMENT
A
B
c
Inspect the equipment for damage incurred during shipment. If
the equipment has been damaged, report the damage on DD Form
6, Packing Improvement Report.
Check equipment against packing slip to see if shipment is com-
plete. Report all discrepancies in accordance with instructions in
DA Pam 738-750.
Check ammunition issued for .50-caliber machine gun M2 and per-
sonnel weapons to verify ammunition received was ammuni-
tion requisitioned. Conduct visual check of all ammunition for
scratches, dents, grease and other conditions which could make
use of ammunition hazardous.
REPROCESSING UNPACKED EQUIPMENT
A Clean all tools and equipment.
B
Properly stow all basic issue items in designated stowage areas
(TM 9-2350-267-10).
C Cleaning rust-preventive compound from vehicle and components
will be done in accordance with p 2-2.
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED FOR IN-
STALLATION (Appx B)
ASSEMBLY OF EQUIPMENT
The M992 vehicle equipment and systems are shipped as assembled
units. Assembly is not required upon receipt of equipment. However,
assembly of related components is discussed in detail in Chapters 3 thru
16 of this manual. These chapters provide detailed information on
removal, disassembly, assembly and installation of equipment for
maintenance purposes at the organizational level.
INSTALLATION INSTRUCTIONS
General location of vehicle on-board equipment, equipment
racks/brackets and stowage equipment is shown on p 1-6.
Removal and installation of components for maintenance purposes are
covered in detail in Chapters 3 thru 16 of this manual.
2-3/(2-4 blank) Change 3
TM 9-2350-267-20