C Perform complete annual service.CHECKING UNPACKED EQUIPMENTABcInspect the equipment for damage incurred during shipment. Ifthe equipment has been damaged, report the damage on DD Form6, Packing Improvement Report.Check equipment against packing slip to see if shipment is com-plete. Report all discrepancies in accordance with instructions inDA Pam 738-750.Check ammunition issued for .50-caliber machine gun M2 and per-sonnel weapons to verify ammunition received was ammuni-tion requisitioned. Conduct visual check of all ammunition forscratches, dents, grease and other conditions which could makeuse of ammunition hazardous.REPROCESSING UNPACKED EQUIPMENTA Clean all tools and equipment.BProperly stow all basic issue items in designated stowage areas(TM 9-2350-267-10).C Cleaning rust-preventive compound from vehicle and componentswill be done in accordance with p 2-2.TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED FOR IN-STALLATION (Appx B)ASSEMBLY OF EQUIPMENTThe M992 vehicle equipment and systems are shipped as assembledunits. Assembly is not required upon receipt of equipment. However,assembly of related components is discussed in detail in Chapters 3 thru16 of this manual. These chapters provide detailed information onremoval, disassembly, assembly and installation of equipment formaintenance purposes at the organizational level.INSTALLATION INSTRUCTIONSGeneral location of vehicle on-board equipment, equipmentracks/brackets and stowage equipment is shown on p 1-6.Removal and installation of components for maintenance purposes arecovered in detail in Chapters 3 thru 16 of this manual.2-3/(2-4 blank) Change 3TM 9-2350-267-20
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business