13-38
TM 9-2350-267-20
APU CONTROL BOX: REMOVAL, DISASSEMBLY, ASSEMBLY, CIRCUIT TEST AND INSTALLATION (CONTINUED)
F
Remove engine oil pressure gage bracket (13) by removing
two nuts (14) and two lockwashers (15) from rear of gage box.
G Remove ENGINE OIL PRESSURE gage (16) from front of
control box.
H Remove FUEL SHUTOFF switch (17), APU GENerator
switch (18), PREHEAT switch (19) and START switch (20)
by removing from each, two screws (21), two lockwashers
(22) and one guard (23).
I
Remove LOW OIL PRESSure and HIGH AIR Temperature
lights (24) by removing from each, two screws (25) and two
lockwashers (26).
ASSEMBLY
A Reverse disassembly procedures.
B
For wiring harness installation/connection use diagram
on p 13-35.
TA309984