TM 9-2350-267-10OPERATING THE APU - Continued5. Attach slave cable (3) to slave receptacle (4) on both vehicles.6. Turn your vehicle’s MASTER switch ON and start APU(p 2-116).7. Allow APU to warm up for three minutes, then turn ON the APU GENeratorswitch (5).8. Turn MASTER switch in supported vehicle to SLAVE.minutes to charge battery.Hold it to SLAVE five2-127
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business