TM 9-2350-261-34
16. Place tarpaulin
(3) on top deck
17. Place two cable
(1), four straps (2), and fid
of earner.
assemblies, six towlines, six
shackles, and fid on tarpaulin (1).
18.
19.
20.
Fasten anchor kit items (4) on tarpaulin (1)
with three straps (5) that are part of
tarpaulin.
Wrap tarpaulin (1) over anchor kit items
(4). Fasten tarpaulin together with three
straps (6) and webbing (7) that are parts of
tarpaulin. Use fid (rounded
towlines into tarpaulin.
Install tarpaulin (1) on top
Secure with four straps (2)
on top deck.
pin) to tuck
deck of carrier.
fastened to loops
END OF TASK
Change 3
17-11 (17-12 blank)/(18-1 thru 19-2 deleted)