7s. From inside power plant compartment,
connect right headlight wiring harness (1),
voltage regulator lead (2), and two power
plant harness leads (3) to drivers
compartment bulkhead.
79. Inside drivers compartment, connect circuit
516A lead (4) to infrared power pack (5).
80.
TM9-2350-261-34
Inside drivers compartment, install front
main wiring harness (6) on two cradles (7).
Secure with two cradle clips (S).
N O T E
If voltage regulator was removed in step
25, do step 81. Otherwise, go to step 82.
Install voltage regulator (9) on four
weldnuts (10). Secure with eight new
lockwashers (11) and four screws (12).
Connect two connectors (13) to regulator (9).
INSIDE DRIVERS
COMPARTMENT
GO TO NEXT PAGE
6-29