TM9-2350-261-34
R E P I A C E E N G I N E
DESCRIPTION
This task covers:
Remove (page 3-29).
Install (page 3-40).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 35, App B)
Lifting Sling (Item 84, App B)
Open End Box Wrench (Item 108, App B)
Torque Wrench (Item 114, App B)
Torque Wrench (Item 117, App B)
Materials/Parts:
Antiseize compound (Item 8, App C)
Sealing compound (Item 70, App C)
Sealing compound (Item 71, App C)
Sealing compound primer (Item 74, App C)
Container, 1 gallon (4 liters)
Fuel filter
Gasket (4)
Key washer (9)
Lockwasher (7)
Oil falter
Self-locking nut (8)
Personnel Required:
Track Vehicle
Helper (H)
References:
See your LO
See your 20
Repairer 63H10
Equipment Conditions:
Engine oil drained (see your LO)
Power plant removed from carrier
(see your -20)
Power plant blocked (page 3-2)
Transmission removed from transfer gearcase
(page 3-4)
Transfer gearcase removed from engine
(page 3-18)
REMOVE
C A U T I O N
Cap or cover openings where fuel, oil,
coolant, or hydraulic lines or fittings have
been removed.
1. Disconnect clamp (1) and coolant tube (2)
from deaeration elbow (3). Remove from
engine.
2. Remove two screws (4) and key washers (5)
from thermostat housing cover (6). Remove
deaeration elbow (3) with hose (7), clamp (8),
elbow (9), and gasket (10) from cover (6).
Discard key washers and gasket.
GO TO NEXT PAGE
Change 1
3-29