TM 9-2350-261-20-2
17.
18.
19.
20.
Thread two bushings (1) into hulls Secure
with four nuts (2), new lockwashers (3),
washers (4), and two washers (5). Do not
tighten nuts.
Install spring washer (6), retainer (7), and
bushing (8) into coupling (9).
Locate service headlight and blackout mark-
er light bushing hole in hull. Slowly slide
connector leads 17, 18, 20 (10) through
hole. Do not damage wiring leads.
Locate second bushing hole in hull. Slowly
slide connector leads 25, 514, 515 (10)
through hole. Do not damage wiring leads.
21.
22.
23.
24.
25.
Crimp six new terminals (11),
insulators (12), and connectors (13) on six
leads.
connect
infrared
connect
Connect
leads 514 (14) and 515 (15) to
headlights (16).
lead 25 (17) to horn (18).
lead 20 (19) to blackout marker
light (20).
Bend and tape leads 17 and 18 (21 and 22)
as shown. Connect leads to service
headlights (23).
F O L L O W - T H R O U G H S T E PS
1. Lower power plant grill (page 5-2).
3. Close power plant front access door
(see your -10).
2. Connect battery ground lead (page 13-2).
4. Raise trim vane (see your -10).
END OF TASK
12-81