TM 9-2350-261-20-217.18.19.20.Thread two bushings (1) into hulls Securewith four nuts (2), new lockwashers (3),washers (4), and two washers (5). Do nottighten nuts.Install spring washer (6), retainer (7), andbushing (8) into coupling (9).Locate service headlight and blackout mark-er light bushing hole in hull. Slowly slideconnector leads 17, 18, 20 (10) throughhole. Do not damage wiring leads.Locate second bushing hole in hull. Slowlyslide connector leads 25, 514, 515 (10)through hole. Do not damage wiring leads.21.22.23.24.25.Crimp six new terminals (11),insulators (12), and connectors (13) on sixleads.connectinfraredconnectConnectleads 514 (14) and 515 (15) toheadlights (16).lead 25 (17) to horn (18).lead 20 (19) to blackout markerlight (20).Bend and tape leads 17 and 18 (21 and 22)as shown. Connect leads to serviceheadlights (23).F O L L O W - T H R O U G H S T E PS1. Lower power plant grill (page 5-2).3. Close power plant front access door(see your -10).2. Connect battery ground lead (page 13-2).4. Raise trim vane (see your -10).END OF TASK12-81
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business