TM 9-2350-261-20-2
R E P L A C E F R O N T D O M E L I G H T S W I T C H
( M 5 7 7 A 2 A N D M 1 0 6 8 O N L Y)
I N I T I A L S E T UP
Tools:
References:
General Mechanics Tool Kit (Item 30, App D)
see your -10
Materials/Parts:
Equipment Conditions:
Gasket
Engine stopped/shutdown (see your -10)
Self-locking nut (8)
Battery ground lead disconnected (page 13-2)
Personnel Required:
Unit Mechanic
R E M O V E
1.
2.
Remove eight locknuts (l), washers (2),
screws (3), and master switch panel (4) from
distribution box (5). Discard locknuts.
Disconnect circuit 38 lead (6), circuit 38A
lead (7), and circuit 10 lead (8) from rear of
front dome light switch (10).
3. Remove two screws (9) and switch (10) from
master switch panel (4).
4. Inspect gasket (11). Replace if damaged.
I N S T A L L
5.
6.
7.
Place switch (10) in master switch panel (4).
Secure with two screws (9).
Connect circuit 10 lead (8), circuit 38A
lead (7), and circuit 38 lead (6) to rear of
dome light switch (10).
Place panel (4) on distribution box (5). Secure
with eight screws (3), washers (2), and new
locknuts (1) .
F O L L O W - T H R O U G H S T E P S
1. Connect battery ground lead (page 13-2).
3. Turn on front dome light switch to check
that switch is operable. Dome light should
2. Turn MASTER SWITCH ON.
come on.
4. Tum all switches OFF (see your -10).
END OF TASK
12-68
Change 3