INSTALL
12.
13.
14.
15.
16,
Apply a thin even coat of sealing compound
to cleaned external threads of hose and
fittings.
Install tee (1) in linkage bracket (2). Secure
with two washers (3) and nut (4).
Connect air box heater fuel hose (5) to
tee (l).
Install elbow (6) in left cylinder head.
Install coupling (7) and elbow (8) in engine.
Connect hose (9) to elbow (8).
17.
18.
19.
20.
21.
22.
23.
TM 9-2350-261-20-1
Install elbow (10), nipple (11), and tee (12)
on engine.
Connect hoses (9) to tee (12).
Secure tube (9) with two clamps (14),
washers (15), new lockwashers (16), and
SCreWS (17) to engine.
Connect tube (13) to tee (1) and elbow (6).
Use open end wrench to tighten.
Connect fuel return hose (18) to tee (1).
Install quick disconnect coupling (19) in fuel
return hose (18).
Connect quick disconnect couplings (19).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Stop/shutdown engine (see your -10).
2. Start engine (see your -10). Check for leaks.
5. Install power plant rear access panel
(page 24-27 or 24-29).
3. Raise and lock ramp (see your -10).
END OF TASK
6-119