INSTALL12.13.14.15.16,Apply a thin even coat of sealing compoundto cleaned external threads of hose andfittings.Install tee (1) in linkage bracket (2). Securewith two washers (3) and nut (4).Connect air box heater fuel hose (5) totee (l).Install elbow (6) in left cylinder head.Install coupling (7) and elbow (8) in engine.Connect hose (9) to elbow (8).17.18.19.20.21.22.23.TM 9-2350-261-20-1Install elbow (10), nipple (11), and tee (12)on engine.Connect hoses (9) to tee (12).Secure tube (9) with two clamps (14),washers (15), new lockwashers (16), andSCreWS (17) to engine.Connect tube (13) to tee (1) and elbow (6).Use open end wrench to tighten.Connect fuel return hose (18) to tee (1).Install quick disconnect coupling (19) in fuelreturn hose (18).Connect quick disconnect couplings (19).FOLLOW-THROUGH STEPS1. Connect battery ground lead (page 13-2).4. Stop/shutdown engine (see your -10).2. Start engine (see your -10). Check for leaks.5. Install power plant rear access panel(page 24-27 or 24-29).3. Raise and lock ramp (see your -10).END OF TASK6-119
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business