TM 9-2350-261-20-1FOLLOW-THROUGH STEPS1. Connect battery ground lead (page 13–2).4.2. Start engine (see your -10). Check for leaks.503. Raise and lock ramp (see your -10).Stop/shutdown engine (see your -10).Install power plant rear access panel(page 24-27 or 24-29).END OF TASK6-103
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business