TM 9-2350-261-20-1
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Install work tables
(page 24-173, 24-175 or 24-178).
2. Check that fuel quantity transmitter operates
properly (see your -10).
5. Raise and lock ramp (see your -10).
3. Install map board (see your -10).
6. Stop/shutdown engine (see your -10).
END OF TASK
6 - 5 6