TM 9-2350-261-20-1FOLLOW-THROUGH STEPS1. Connect battery ground lead (page 13-2).4. Install work tables(page 24-173, 24-175 or 24-178).2. Check that fuel quantity transmitter operatesproperly (see your -10).5. Raise and lock ramp (see your -10).3. Install map board (see your -10).6. Stop/shutdown engine (see your -10).END OF TASK6 - 5 6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business