TM 9-2350-247-20-2
REPLACE EXHAUST PIPES (M548A1) -- Continued
0209 00
4.
Place exterior exhaust pipe (8) and new gasket (9) on power plant bulkhead. Secure with 6 screws (10), new lock nuts
(11), and 12 washers (12).
5.
Turn MASTER SWITCH ON (see your -10).
6.
Start engine (see your -10). Check for proper installation of exhaust pipes.
7.
Stop engine (see your -10).
8.
Install top access cover and exhaust grille (WP 0390 00).
9.
Install exterior exhaust pipe extension (13) on exterior exhaust pipe (8). Secure with two clamps (14).
FOLLOW-THROUGH STEPS
1.
Install engine exhaust pipe guard (WP 0208 00). Install power plant rear access door (see your -10).
END OF TASK
0209 00-4