TM 9-2350-287-20-1
7-73. TRAILER RECEPTACLE AND CABLE ASSEMBLY (12330246) REPLACEMENT (continued).
[Text Deleted]
b.
INSTALLATION
1.
Install new gasket (12) on receptacle
(10).
2.
Install
receptacle
(10)
with
cable
assembly (11 ) on vehicle.
3.
Install receptacle cover (15) on vehicle.
4.
Secure new gasket (12), receptacle
(10), and receptacle cover (15) on
vehicle with four screws (14) and new
lockwashers (13).
5.
Install two wiring harness straps (1) by
installing screw (4), new lockwasher (3),
and washer (2) on each strap (1).
6.
Connect two cable assembly ground
lugs (6) to vehicle mounting studs with
screw (7) and two new lockwashers (5).
7.
Connect five connectors (9) to five
wiring harness 12330252 connectors
(8).
FOLLOW-ON MAINTENANCE:
Install APU control box (para 7-22).
Connect battery ground cables (para 7-41).
Change 1 7-225