Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
7-72. INTERVEHICULAR GROUNDING CABLE AND STOWAGE STRAPS REPLACEMENT
b. INSTALLATION - TM-9-2350-287-20-1_923
TM-9-2350-287-20-1 Carrier Ammunition Tracked M992A21 (2350-01-352-3021) EIC:AE6 Manual
Page Navigation
889
890
891
892
893
894
895
896
897
898
899
TM 9-2350-287-20-1
7-73. TRAILER RECEPTACLE AND CABLE ASSEMBLY (12330246) REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
General mechanic's tool kit (Item 24,
Vehicle parked on level ground (refer to
Appendix I)
TM 9-2350-287-10).
MASTER switch set to OFF (refer to
Materials/Parts:
TM 9-2350-287-10).
Tape, insulation, electrical (Item 67, Appendix D)
Battery ground cables disconnected (para 7-41).
Gasket (Item 96, Appendix H)
APU control box removed (para 7-22).
Lockwasher (2) (Item 136, Appendix H)
Lockwasher (6) (Item 175, Appendix H)
a.
REMOVAL
1.
Disconnect five connectors (9) from harness 12330252 connectors (8).
2.
Disconnect two cable assembly ground lugs (6) from vehicle mounting studs by removing screw (7) and two
lockwashers
(5). Discard lockwashers.
NOTE
Do not remove other wiring harnesses from straps. Install hardware after wiring
harness straps have been removed.
3.
Remove two wiring harness straps (1) by removing screw (4), lockwasher (3), and washer (2) from each strap (1).
Discard lockwashers.
4.
Remove four screws (14) and
lockwashers
(13) and receptacle cover (15) from trailer receptacle (10). Discard
lockwashers.
5.
Pull receptacle (10), gasket (12), and cable assembly (11) from rear of vehicle.
6.
Remove gasket (12) from receptacle (10). Discard gasket.
[Text Deleted]
Change 1 7-224
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business