TM 9-2350-287-20-13-3. GROUND HOP PROCEDURES (continued).9.10.NOTEPerform steps 9 through 11 only if the vehcle being used to operate theis the one from which the powerpack was removed.Connect twoConnect twoelectrical connectors (22 and 23) to master relay (24).electrical connectors (25 and 26) to voltage regulate (27).3-20
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business