TM 9-2350-287-20-13-3. GROUND HOP PROCEDURES (continued).17.Connect power cable assembly 12268426 (30) to wiring harness 12268308 connector (38).18.Connect starter protection electrical lead 503 (39) to electrical lead 503 (40).3-22
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business