TM 9-2350-287-20-13-3.GROUND HOP PROCEDURES (continued).2.Install safety screen (8) on turbocharger inlet (10) with fine screen side facing out, and install exhaust clamp (9) onturbocharger inlet (10).3.Install exhaust pipe (7) on exhaust outlet (6) with clamp (5).4.Position surge tank (11) to one side, being careful not to bend hoses.Change 1 3-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business