TM 9-2350-287-20-1
3-3.
GROUND HOP PROCEDURES (continued).
2.
Install safety screen (8) on turbocharger inlet (10) with fine screen side facing out, and install exhaust clamp (9) on
turbocharger inlet (10).
3.
Install exhaust pipe (7) on exhaust outlet (6) with clamp (5).
4.
Position surge tank (11) to one side, being careful not to bend hoses.
Change 1 3-17