TM 9-2350-287-10
PROJECTILE RACK OPERATION (continued)
15. Use hoist (3) and trolley assembly (2) to position rack assembly onto rack-restraint pins (12) and floor pins (14).
Secure rack assembly to floor by installing bottom connecting rods (i 1i).
16. Repeat steps 14 and 15 for right rack assembly, if necessary.
17. If left rack assembly is installed, secure its upper portion with angle (6), spacer (5), and two flat washers (9),
lockwashers (7), and screws (8).
18. Remove hook of hoist (3) and beam (1) and stow beam (1), trolley assembly (2), and hoist (3).
19. If right projectile rack assembly was moved, install right front double seat (p. 2-117).
20. Close top doors (pp. 2-135 and 2-136).
2-186