TM 9-2350-287-10
PROJECTILE RACK OPERATION (continued)
Unloading Projectiles
NOTE
Before beginning to unload projectiles from rack sections, vehicle must be on level ground.
1.
Deploy conveyor (p. 2-150).
2.
Unlock rack section to be unloaded by releasing both handles (1) from locking clips (3).
NOTE
If necessary, install extension handle over projectile rack handles to obtain additional leverage.
3.
Secure handles (1) in unlocked position by pushing them upward and locking them with locking clips (2) on rack
section above. Handles on top rack sections can be retained by locking clip on stowage boxes.
NOTE
If any projectile sticks, refer to troubleshooting section (pp. 3-14 and 3-15).
2-181